21 thg 10, 2009

Thinking Lean for Laboratory


While it might sound like some sort of fad diet, “lean” in the context of business improvement refers to a specific methodology that originated in the Japanese motor industry toward the end of the 1980s. Over the decades, this lean philosophy has been successfully adopted by many companies across a broad spectrum of industries and, more recently, lean thinking has filtered into laboratories. The focus of a lean laboratory is to test samples in the most efficient way possible in terms of cost, or speed, or both. Although most of the key principles of lean apply in labs, the specific challenges facing laboratories require significant adaptation of standard lean tools.

Laboratories are typically faced with more volatility and variation in the type and volume of work they are required to perform than are manufacturing operations. The life science industry is faced with the additional layer of GMP and GLP complexity. In this context, attention to efficiency and productivity is often secondary. However, there is in fact no inherent conflict between efficiency and compliance. Lean processes in a laboratory achieve regulatory compliance in the most efficient and productive manner possible. A lean lab welcomes auditors and delights in the opportunity to showcase its process improvements along with its capacity to satisfy not just regulators, but customers (internal and external) too.

The factors affecting laboratory performance
Performance in today’s laboratories tends to be negatively affected by a number of issues. These include:

Volatile incoming workload
Most labs experience a volatile incoming workload, with significant peaks and troughs. This results in low productivity during troughs and/or poor lead-time performance during peaks. Understanding laboratory capacity and resource requirements and leveling workloads in a meaningful way is the crux of “leaning” a laboratory. The surest way to fail is to put more work into the lab than it can handle!

Too much WIP (Work in Progress)
Samples do not “flow.” While laboratory analysts may progress speedily through testing, haphazard scheduling resulting from cross-training deficiencies and instrument conflicts means that, at a given time, many samples are partially tested but few are fully completed. Lean in the laboratory means performing the right test at the right time in order to minimize WIP.

Long and variable lead times
In an attempt to be more productive, many laboratories build up queues of samples for tests with long
set-up times (e.g., HPLC or GC). While some grouping of samples is a good idea, this is usually overdone and needs to be controlled in order to avoid long and variable lead times, equipment conflicts, and imbalance in daily analyst workloads.
Ineffective fast-track systems
Labs often attempt to address the unpredictability associated with long and variable lead times by developing a fast-track system to allow urgent samples to be dealt with separately. Typically, however, the proportion of fast-track samples increases over time, to the point of being unmanageable. In designing a lean solution, laboratories can increase the velocity of every sample, eliminating the need to prioritize. This may sound impossible, but it can and should be done. If it is done correctly, the amount of analyst effort required per sample does not change; samples simply spend less time in queues.
Lack of cross-skilling
Training gaps are sometimes attributed to high analyst turnover; however, lack of cross-skilling is often as much of an issue in laboratories with low turnover where staff members have become subject matter experts and are de facto dedicated to specific tests or activities. Labs tend to operate at extreme ends of a spectrum, whereby they are either mimicking Henry Ford–style mass production, with analysts repetitively carrying out the same tasks day in, day out, or they are like “craft producers,” taking a sample through its full testing schedule whether it is productive to do so or not. In most cases, the optimum resourcing will be in the middle, with each analyst having the capability of doing all of the testing, but carrying out defined combinations of tests that use their time well and reproducibly meet demand in the most productive way.

Muda, Mura, Muri: Lean laboratory pitfalls
The focus of many lean laboratory projects is almost totally on waste reduction (or Muda, to give it its
Japanese name). Significant time is spent on valuestream mapping to highlight new “wastes” to work on; while some improvements are made, these are often not converted into meaningful overall performance improvement.
This is no surprise; waste is easy to see and understand whereas the more challenging wastes of “Mura”—the waste of unevenness (volatile workloads) and “Muri”— the waste of overburden (imbalance in daily analyst workloads) are often ignored. These are more difficult to understand, but effective dealings with them will deliver significantly greater productivity improvement than will tackling waste alone; indeed, this will provide a context in which the benefits of waste reduction can be “spent.”


The recipe for success
The most successful lean laboratory projects tackle the “leveling” and “standard work” aspects first. The best foundation for a lean laboratory is analysis of historical data and forecasts, in order to understand the leveled demand rate of testing and resourcing so as to adequately meet this leveled demand rate. Successful leveling of a volatile load and mix will significantly improve productivity and/or lead time. The productivity improvement can be used to provide additional capacity or converted into a cost reduction.

Four Key Components
1. Level the load and mix into the Lab using a leveling ‘Q’ or other Heijunka device.
2. Apply ‘Pacemaker’ scheduling to the 1st process step downstream from the Heijunkja.
3. Create Standard Work and analyst’s roles that ensures FIFO after the Pacemaker (i.e. once a sample is launched into the Lab do not let it stop or ‘Q’ again).
4. Short interval performance management (i.e. review performance daily and correct if necessary).

Routine testing can be leveled via “rhythm wheels” or “trains,” depending on the volatility of the laboratory in question. A rhythm wheel is a repeating cycle of tests with fixed quantities of sample per test. The number of samples to be tested is calculated to meet the leveled demand rate, and every test is carried out at a defined interval. This type of solution is best where incoming volatility is low and sample volume is high. When volatility is high and sample volume low, a train’s solution is employed. This involves defining a pattern of tests to optimize the throughput time of a group of samples, with a leveling queue being used to allow samples to build up before being moved very quickly through the sequence of testing. Due to the complex mix of samples and tests, laboratories are often required to construct creative hybrids of rhythm wheels and trains to configure a best-fit solution. When the optimal testing sequences have been defined, standard work roles ensure that analysts execute their tasks in the same order, with the same number of samples on the defined days to reproducibly meet the demand rate. With the mura and muri under control, muda can be addressed to further enhance the solution. Laboratories have great scope for waste elimination, starting with the housekeeping aspect via 5S and moving on to improvements in training systems (to increase the velocity with which a new analyst becomes fully productive) and documentation (via lean test documentation and “Excellent SOPs”).

The lean journey
The design of the new lean lab process is only the first part of the journey. A clean, easy transfer from the existing process to the new one is not always possible or practical (manufacturing must not be impeded), and operation of a dual system (for a period of time) may be necessary. Focused management is required to ensure that the old system is phased out without impacting manufacturing.
The temptation to revert to old habits at the first hurdle…and the second…and the third…must be avoided. Tenacity is required, as well as frequent communication about the benefits of change. It is important for all concerned to realize that lean in the laboratory is about more than a one-off project. The motivation to continually improve how the new process works must be maintained and performance must be managed and monitored using appropriate KPIs (key performance indicators).

The results
Depending on the focus of the lean initiative, results will be seen in productivity improvement or increased testing speed— but often results will be seen in both areas. These measurable improvements (from laboratories that have recently completed lean projects) demonstrate what can be achieved.
Lab work is not the same as manufacturing, but lean thinking can and should be applied in the laboratory environment.

Xung quanh lời kêu gọi đóng góp không được hưởng ứng nồng nhiệt

Diễn đàn ChemVN lâm vào tình trạng sắp bị đóng cửa vì không có kinh phí duy trì server, domain, mua dịch vụ hổ trợ Vbuletin,… Tôi cảm thấy ngạc nhiên vì lời kêu gọi của Admin không được mọi người hưởng ứng dù rằng số thành viến đăng ký lên đến gần 12000 người với hơn 200 thành viên tham gia thường trực vào thời điểm đó.

Như vậy, có một vấn đề về cách điều hành và ảnh hưởng offline của diễn đàn đến ý thức của các thành viên.

Tại sao không thể quyên góp và vận động được cho tổng chi phí 12.000.000 VND/năm ở diễn đàn này? Với phép tính, nếu chia ra cho 12.000 người thì chỉ cần 1.000 VND/người. Còn nếu chỉ với 200 thành viên tích cực thì mức đóng góp sẽ là 60.000 VND/người.

Có nhiều ý kiến mà tôi lắng nghe được trong những ngày qua:
- Các mục chi phí chưa rõ ràng
- Giá của nhà cung cấp dịch vụ quá cao
- Cách thức chuyển-nhận tiền ủng hộ chưa cụ thể và phù hợp
- Diễn đàn là nơi miễn phí mà, đâu có gì là ràng buộc để mà phải quyên góp!
- Ban quản trị thấy ghét, phe nhóm và tự mãn quá!
- Diễn đàn toàn là sinh viên nghèo mà sao kêu gọi đóng góp được.
- Nội dung diễn đàn nghèo nàn, lạc hậu mà luật lệ thì cứng nhắc nhưng lại dê dãi cho người quen biết trong nhóm.
- Hoạt động offline của diễn đàn quá kém, không thu hút nhiều mạnh thường quân quan tâm đúng mức để có tài trợ tương xứng
- Diễn đàn lộn xộn quá! Vàng thau lẫn lộn.
- Diễn đàn vi phạm bản quyền thì làm sao tôi đóng góp được. Nếu biết tôi là doanh nghiệp đi ủng hộ một chức vi phạm bản quyền thì coi sao được.
- Ban quản trị thiển cận và độc đoán trong cách thức điều hành quá! Tôi vào tham gia muốn có đóng góp ý kiến chuyên môn nhưng họ có chịu lắng nghe ý kiến mình đâu. Họ sợ mình có sự ảnh hưởng nhiều hơn họ!
- Lo gì vội, sớm muộn gì thì admin sẽ nhanh chóng tìm ra tài trợ thôi mà.
- Ban quản trị cần cam kết về định hướng rõ ràng hơn trong hoạt động của diễn đàn.

Vấn đề xem ra không thể nghĩ đơn giản được. Việc mổ xẻ nguyên nhân cần phải có sự động não của ban quản trị để giải quyết căn cơ và thay đổi nếu thấy cấn thiết.

Thời gian từ đây đến cuối năm quả không còn là nhiều nữa.